7/04/2009

raising the roof


after postponing the roof-raising two times, we finally had a date set. thursday july 2. star delayed our construction by a week. the truss engineer lost page 12b out of our book and couldn't complete his work on time? fortunately Colin Grover made him stay late after work to complete his homework. it got done. the material was delivered on july second as promised. ironically it rained all weekend. thanks Ted




the roof is off, well done Graham. i was there with few of our neighbors in the morning to watch the show put on by Ken, the boom truck operator. it was fascinating. the amount of control he had over this massive machine. i have made a video of this but i don't know how to turn the image around. now the fun begins. in about 8 days we'll have the second floor up and i can get to work on the electrical and plumbing. keep watching.

6/30/2009

D E M O - bring your friends


i was very surprised with the call-out for friends to help me take down my walls. the local cycling blog FGBC made a small announcement in the cycling circles, and results were awesome. seven of them showed up on time. i was late, as usual. John, Sima, Hal, Colin, Chris, Dave, Johnny. they were great. we had the house stripped in about 7 hours of work. drywall, lath and plaster, all in the bin. the next is the roof. thanks guys.

6/29/2009

life after paragon


they've been gone for a while now, but i wanted to show some of the images of the house after Paragon.